- The overall capacity of the export terminal is approximately 88 million barrels per annum (~1.2×107 t/a) of oil;
- The area of the terminal covers nearly 256,000 square metres (2,760,000 sq ft);
- Construction activity May 2003 – August 2006;
- Tanker loading capacity is suitable for Aframax tankers up to 110,000 DWT. The five Aframax tankers servicing the terminal are purpose-designed double-hull ice class vessels;
Contract included the construction of an offsite camp and temporary site facilities, the clearance and grubbing of trees and shrubbery in an area of 256,000 sqm, as well as site preparation and earthworks amounting to 1 million cubic meters, surface water drainage, land drainage, fencing works for the entire DeKastri Oil Export Terminal Area, in addition to slope protection, road construction, stone paving and steel structure erection works for the buildings within Terminal Area. At the request of the client, while these works were underway, the reconstruction of the site access road, the EPC delivery of a sewage treatment plant and the supply and delivery of 150,000 cubic meters of crushed stone from a crusher plant established by the contractor were also performed.